[1] Barlow R Hunter L. Optimum preventive maintenance policies [J]. European Journal of Operational Research, 1960, 8(1): 90-100. [2] 谭林,陈童,郭波.基于几何过程的单部件可修系统最优维修策略[J].系统工程, 2008, 26(6): 88-92. TAN Lin, CHEN Tong, GUO Bo. Optimal maintenance strategy for the repairable system consisting of one component based on geometric process [J]. Systems Engineering, 2008, 26(6): 88-92. (in Chinese) [3] 王冠军,张元林.维修时间受限的单部件系统几何过程维修模型[J]. 东南大学学报, 2013, 43(6): 1335-1339. WANG Guan-jun, ZHANG Yuan-lin. Geometric process model for a single-unit system with limit repair time [J]. Journal of Southeast University, 2013, 43(6): 1335-1339. (in Chinese) [4] Malik M A K. Reliable preventive maintenance scheduling[J]. AIIE Transactions, 1979, 11(3): 221-228.(in Chinese) [5] Nakagawa T. Sequential imperfect preventive maintenance policies [J]. IEEE Transactions on Reliability, 1988, 37(3): 295-298. [6] Nakagawa T, Kowada M. Analysis of a system with minimal repair and its application to replacement policy [J]. European Journal of Operational Research, 1983, 12(2): 176-182. [7] Zhang Y L, Yam R C M, Zuo M J. A bivariate optimal replacement policy for a multistate repairable system [J]. Reliability Engineering and System Safety, 2007, 4(92): 535-542. [8] 刘晓东.装备寿命周期费用分析与控制[M].北京:国防工业出版社, 2008: 1-48. LIU Xiao-dong. Material life cycle cost analysis and control [M]. Beijing: National Defense Industry Press, 2008:1-48. (in Chinese) [9] 李果,高建民,陈富民.基于可靠性的设备维修优化方法研究[J]. 中国机械工程, 2007, 18(4): 419-422. LI Guo, GAO Jian-min, CHEN Fu-min. Research on equipment maintenance optimization based on reliability [J]. China Mechanical Engineering, 2007, 18(4): 419-422.(in Chinese) [10] 苏春,黄茁,许映秋.基于可用度和维修成本的设备维修建模与优化[J]. 中国机械工程, 2007, 18(9): 1096-1099. SU Chun, HUANG Zhuo, XU Ying-qiu. Modeling and optimization for device's maintenance based onallowable availability constraint and maintenance cost [J]. China Mechanical Engineering, 2007, 18(9): 1096-1099.(in Chinese) |