[1] 王正元, 严小琴, 朱昱, 等. 一种考虑专业的动态维修任务调度的优化方法[J]. 兵工学报, 2009, 30(2):252-256. WANG Zheng-yuan, YAN Xiao-qin, ZHU Yu, et al. An optimal method on dynamic maintenance task scheduling with subject taken into account[J]. Acta Armamentarii, 2009, 30(2): 252-256.(in Chinese) 图5 经优化的维修任务调度方案的甘特图 Fig.5 Gantt chart of optimized maintenance task scheduling plan [2] 朱昱, 宋建社, 王正元. 一种基于最大保障时间的战时装备维修任务调度[J]. 系统工程与电子技术, 2007, 29(11):1900-1903. ZHU Yu, SONG Jian-she, WANG Zheng-yuan. Scheduling model of the battle equipment maintenance task based on the most support time[J]. Systems Engineering and Electronics, 2007, 29(11):1900-1903.(in Chinese) [3] 朱昱, 宋建社, 曹继平, 等. 一种考虑装备维修流程的多维修任务调度[J]. 系统工程与电子技术, 2008, 30(7):1366-1369. ZHU YU, SONG Jian-she,CAO Ji-ping, et al. Maintenance task scheduling model of multiunit considering armament maintenance process[J]. Systems Engineering and Electronics, 2008, 30(7):1366-1369. (in Chinese) [4] Gemmill D. Shop floor scheduling for program depot maintenance considering stochastic repair needs[R]. US: Air Force Office of Scientific Research, 2000. [5] Kolisch R. Serial and parallel resource-contrained project scheduling methods revisited:theory and computation[J]. European Journal of Operational Research, 1996, 90(2):320-333. [6] 方晨, 王凌. 资源约束项目调度研究综述[J]. 控制与决策,2010, 25(5):641-651. FANG Chen, WANG Ling. Survey on resource-constrained project scheduling[J]. Control and Decision,2010, 25(5):641-651.(in Chinese) [7] Bellenguez-Morineau O. Methods to solve multi-skill project scheduling problem[J]. 4OR: A Quarterly Journal of Operation Research, 2008, 6(1): 85-88. [8] Bellenguez O, Ne′ron E. Lower bounds for the multi-skill project scheduling problem with hierarchical levels of skills[J]. Lecture Notes in Computer Science, 2005, 3616: 229-243. [9] 喻小光, 战德臣, 聂兰顺, 等. 柔性资源约束的资源水平项目调度问题[J].计算机集成制造系统, 2010, 16(9):1967-1976. YU Xiao-guang, ZHAN De-Chen, NIE Lan-shun, et al.Flexible resource constrained resource leveling project scheduling problem [J]. Computer Integrated Manufacturing Systems, 2010, 16(9):1967-1976.(in Chinese) [10]黄敏镁, 罗荣桂. 柔性资源约束下的产品开发项目优化调度研究[J]. 管理工程学报, 2010, 24(4):143-148. HUANG Min-mei, LUO Rong-gui.Study on flexible-resource-constrained product development project scheduling[J]. Journal of Industrial Engineering/Engineering Management, 2010, 24(4): 143-148.(in Chinese) [11]Zhang H, Li X, Li H. Particle swarm optimization-based schemes for resource-constrained project scheduling[J]. Automation in Construction, 2005, 14(3): 393-404. [12]Jarboui B, Damak N, Siarry P. A combinatorial particle swarm optimization for solving multi-mode resource-constrained project scheduling problems[J]. Applied Mathematics and Computation, 2008, 195(1): 299-308. [13]Sprecher A, Kolisch R, Drexl A. Semi-acitive, active, and non-delay schedules for the resource-constrained project scheduling problem[J]. European Journal of Operational Research, 1995, 80(1): 94-102. [14]潘全科, 王凌, 高亮. 离散微粒群优化算法的研究进展[J]. 控制与决策, 2009, 24(10):1441-1449. PAN Quan-ke, WANG Ling, GAO Liang. The-state-of-art of discrete particle swarm optimization algorithms[J]. Control and Decision,2009, 24(10):1441-1449.(in Chinese) [15]邓林义. 资源受限的项目调度问题及其应用研究[D]. 大连:大连理工大学, 2008. DENG Lin-yi. Research on the resource-constrained project scheduling problem with its application abstract[D].Dalian:Dalian University of Technology, 2008.(in Chinese) |