Combinatorial Optimization Methods for Determining the Pre-storage Location and Pre-setting the Distribution of EquipmentMaintenance Materials
CAO Junhai1, ZHANG Chuang1, LI Yantong2, GUO Yiming1, GUO Qingyi3
(1. Department of Equipment Support and Remanufacturing, Army Academy of Armored Forces, Beijing 100072, China; 2. School of Maritime Economics and Management, Dalian Maritime University, Dalian 116026, Liaoning, China; 3. Unit 65316 of PLA, Dalian 116300, Liaoning, China)
CAO Junhai, ZHANG Chuang, LI Yantong, GUO Yiming, GUO Qingyi. Combinatorial Optimization Methods for Determining the Pre-storage Location and Pre-setting the Distribution of EquipmentMaintenance Materials[J]. Acta Armamentarii, 2022, 43(10): 2668-2678.
[1] 张志勇,黎忠诚.美军物流系统的变革方略(三) 美军物流资源配置的有效方式:战略预置[J].物流技术,2007,26(6):131-132. ZHANG Z Y,LI Z C.The reform strategy of the U.S. army's logistics system (3) the effective way of the U.S. army's logistics resource allocation:strategic presetting[J].Logistics Technology,2007,26(6):131-132. (in Chinese) [2] 林勇,王丰,安建勇,等.美国陆军预置储备的基本情况与启示[J].军事交通学院学报,2021,23(2):52-56. LIN Y,WANG F,AN J Y,et al.Basic situation and enlightenment of US Army's pre-positioned reserve[J].Journal of Military Transportation University,2021,23(2):52-56. (in Chinese) [3] 李守耕,陈铁祺,王丰.战备物资预置储备模式研究[J].军事交通学院学报,2019,21(7):57-60,76. LI S G,CHEN T Q,WANG F.On preset reserve mode for combat readiness material[J].Journal of Military Transportation University,2019,21(7):57-60,76. (in Chinese) [4] 王耀,李斌,周济晓,等.陆军全域作战后勤战备物资预置储备研究[J].军事交通学院学报,2019,21(11):50-53. WANG Y,LI B,ZHOU J X,et al.Preset storage of logistical war readiness materials for army full-domain operations[J].Journal of Military Transportation University,2019,21(11):50-53. (in Chinese) [5] 张巍,姜大立.战时前沿补给基地选址模型及其拉格朗日松弛算法研究[J].军事运筹与系统工程,2019,33(2):54-61. ZHANG W,JIANG D L.Research on the location model of frontier supply base in wartime and its Lagrangian relaxation algorithm[J].Military Operations Research and Systems Engineering, 2019,33(2):54-61. (in Chinese) [6] 王申坪,李建华,杜敏,等.基于两阶段的广义最大覆盖战时装备仓库选址模型[J].兵器装备工程学报,2020,41(3):41-45. WANG S P,LI J H,DU M,et al.Location model of wartime equipment deport based on two-stage generalized maximum coverage[J].Journal of Ordnance Equipment Engineering,2020,41(3):41-45. (in Chinese) [7] 吕游,袁杰红,孙杨,等.战时物流配送车辆路径优化问题[J].控制与决策,2019,34(1):124-131. L Y,YUAN J H,SUN Y,et al.Optimization of vehicle routing problem in military logistics on wartime[J].Control and Decision,2019,34(1):124-131. (in Chinese) [8] 姜大立,陈元文.战时不确定环境下基于多目标遗传算法的动态路径规划问题研究[J]. 军事运筹与系统工程,2017,31(3): 74-80. JIANG D L,CHEN Y W.Research on dynamic path planning based on multi-objective genetic algorithm in wartime uncertain environment[J].Military Operations Research and Systems Engineering,2017,31(3):74-80.(in Chinese) [9] HENNES H,HAMACHER H W.Integrated scheduling and location models: single machine makespan problems[R].Shaker Verlag,Aachen,Germany:University of Kaiserslautern,2002. [10] KALSCH M T,DREZNER Z.Solving scheduling and location problems in the plane simultaneously[J].Computers & Operations Research,2010,37(2):256-264. [11] AKBARINASAJI S,MCKENDALL A R.Heuristics for the integrated single machine scheduling and location problem[J].International Journal of Industrial and Systems Engineering,2017,27(2):196-209. [12] RAJABZDEH M,ZIAEE M,BOZORGI-AMIRI A.Integrated approach in solving parallel machine scheduling and location(ScheLoc) problem[J].International Journal of Industrial Engineering Computations,2016,7(4): 573-584. [13] WANG S J,WU R C,CHU F,et al.An improved formulation and efficient heuristics for the discrete parallel-machine makespan ScheLoc problem[J].Computers & Industrial Engineering,2020,140:106238. [14] ELVIKIS D,HAMACHER H W,KALSCH M T.Simultaneous scheduling and location(ScheLoc): the planar ScheLoc makespan problem[J].Journal of Scheduling,2009,12(4):361-374. [15] KRAMER R,KRAMER A.An exact framework for the discrete parallel machine scheduling location problem[J].Computers & Operations Research,2021,132:105318. [16] LIU M,LIU X,ZHANG E,et al.Scenario-based heuristic to two-stage stochastic program for the parallel machine ScheLoc problem[J].International Journal of Production Research,2019,57(6):1706-1723. [17] LIU M,LIU R.Risk-averse scheduling-location (ScheLoc) problem[C]∥Proceedings of 2019 International Conference on Industrial Engineering and Systems Management.Shanghai,China:IEEE,2019:1-6. [18] DKHIL H,YASSINE A,CHABCHOUB H.Multi-objective optimization of the integrated problem of location assignment and straddle carrier scheduling in maritime container terminal at import[J].Journal of the Operational Research Society,2017,69(2): 247-269. [19] KALSCH M T.Scheduling-location (ScheLoc) models,theory and algorithms[D].Shaker Verlag,Aachen,Germany:University of Kaiserslautern,2009. [20] MUSAVI M M,BOZORGI-AMIRI A.A multi-objective sustainable hub location-scheduling problem for perishable food supply chain[J].Computers & Industrial Engineering,2017,113:766-778. [21] WESOLKOWSKI S,FRANCETIC N,GRANT S C.TraDE:training device selection via multi-objective optimization[C]∥Proceedings of 2014 IEEE Congress on Evolutionary Computation.Beijing,China:IEEE,2014:2617-2624. [22] ADEMOPOULOS G I,PAPPIS C P.Scheduling under a common due-data on parallel unrelated machines[J].European Journal of Operational Research,1998,105(3):494-501. [23] KORUPOLU M,PLAXTON C G,RAJARAMAN R.Analysis of a local search heuristic for facility location problems[J].Journal of Algorithms,1998,37(1):146-188. [24] BENDERS J F.Partitioning procedures for solving mixed-variables programming problems[J]. Numerische Mathematik,1962,4:238-252. [25] HOOKER J,OTTOSSON G.Logic-based Benders decomposition[J].Mathematical Programming,2003,96(1):33-60. [26] EMDE S,POLTEN L,GENDREAU M.Logic-based benders decomposition for scheduling a batching machine[J].Computers & Operations Research,2019,113:104777. [27] FACHINI R F,ARMENTANO V A.Logic-based benders decomposition for the heterogeneous fixed fleet vehicle routing problem with time windows[J]. Computers & Industrial Engineering, 2020,48:106641. [28] ROSHANAEI V,LUONG C,ALEMAN D M,et al.Collaborative operating room planning and Scheduling[J].INFORMS Journal on Computing,2017,29(3):558-580. [29] GRAHAM R L,LAWLER E L,LENSTRA J K,et al.Optimization and approximation in deterministic sequencing and scheduling:a survey[J].Annals of Discrete Mathematics,1979,12:287-326. [30] TANAKA S,FUJIKUMA S,ARAKI M.An exact algorithm for single-machine scheduling without machine idle time[J].Journal of Scheduling,2009,12(6):575-593. [31] IBARAKI T,NAKAMURA Y.A dynamic programming method for single machine scheduling[J].European Journal of Operational Research,1994,76(1):72-82. [32] SHIM S O,KIM Y D.Scheduling on parallel identical machines to minimize total tardiness[J].European Journal of Operational Research,2007,177(1):135-146.