[1] 毕义明, 杨宝珍, 杨萍,等. 导弹批量测试仿真研究[J]. 火力与指挥控制, 2003, 28(5): 98-100. BI Yi-ming, YANG Bao-zhen, YANG Ping, et al. Simulation study on missile batch testing problem[J]. Fire Control & Command Control, 2003, 28(5): 98-100.(in Chinese) [2] 赵鑫, 肖明清, 夏锐. 基于综合优先级的并行测试调度算法设计及实现[J]. 计算机测量与控制, 2007, 15(4): 423-425. ZHAO Xin, XIAO Ming-qing, XIA Rui. Parallel test scheduling algorithm based on integrated priority and its implementation[J]. Computer Measurement & Control, 2007, 15(4): 423-425.(in Chinese) [3] 丁超,唐力伟,邓士杰. 基于动态优先级的测试任务抢占调度算法[J]. 系统工程与电子技术, 2016, 38(9): 2080-2085. DING Chao, TANG Li-wei, DENG Shi-jie. Test task preemptive scheduling algorithm based on dynamic priority[J]. System Engineering and Electronics, 2016, 38(9): 2080-2085.(in Chinese) [4] 周强,司丰炜, 修言彬. Petri网结合Dijkstra算法的并行测试任务调度方法研究[J]. 电子测量与仪器学报, 2015 (6):920-927. ZHOU Qiang, SI Feng-wei, XIU Yan-bin. Research on the parallel test task scheduling method with Petri nets and Dijkstra algorithm[J]. Journal of Electronic Measurement and Instrumentation, 2015(6):920-927.(in Chinese) [5] 胡海生, 张铎, 李明雨. 基于PERT技术的导弹批量测试流程仿真研究[J]. 弹箭与制导学报, 2008, 28(1): 39-42. HU Hai-sheng, ZHANG Duo, LI Ming-yu. Study of missile batch testing process simulation based on PERT[J]. Journal of Projectiles, Rockets, Missiles and Guidance, 2008, 28(1): 39-42.(in Chinese) [6] 路辉, 李昕. 一种基于分支定界的串行测试任务调度算法[J]. 航空学报, 2008, 29(1): 131-135. LU Hui, LI Xin. A kind of scheduling algorithm for serial test tasks based on branch and bound algorithm[J]. Acta Aeronautica et Astronautica Sinica, 2008, 29(1): 131-135.(in Chinese) [7] 李昕, 沈士团, 路辉. 基于图染色理论的并行测试任务调度算法[J]. 北京航空航天大学学报, 2007, 33(9): 1068-1071. LI Xin, SHEN Shi-tuan, LU Hui. Algorithm of tasks scheduling in parallel test based on graph coloring theory[J]. Journal of Beijing University of Aeronautics and Astronautics, 2007, 33(9): 1068-1071.(in Chinese) [8] 秦勇, 梁旭. 基于混合遗传算法的并行测试任务调度研究[J]. 国外电子测量技术, 2016, 35(9): 72-75. QIN Yong, LIANG XU. Research on hybrid genetic algorithm for parallel test task scheduling[J]. Foreign Electronic Measurement Technology, 2016, 35(9): 72-75.(in Chinese) [9] 陈利安, 肖明清, 高峰,等. 人工蜂群算法在并行测试任务调度中的应用[J]. 计算机测量与控制, 2012, 20(6): 1470-1472. CHEN Li-an, XIAO Ming-qing, GAO Feng, et al. Artificial bee colony algorithm for parallel test tasks scheduling[J]. Computer Measurement & Control, 2012, 20(6): 1470-1472.(in Chinese) [10] 付新华, 肖明清, 刘万俊,等. 一种新的并行测试任务调度算法[J]. 航空学报, 2009, 30(12): 2363-2370. FU Xin-hua, XIAO Ming-qing, LIU WAN-jun, et al. A novel algorithm for parallel test task scheduling[J]. Acta Aeronautica et Astronautica Sinica, 2009, 30(12): 2363-2370.(in Chinese) [11] 夏克寒, 牟建华, 暴飞虎,等. 导弹测试流程优化系统设计与实现[J]. 导弹与航天运载技术, 2012(2): 43-46. XIA Ke-han, MOU Jian-hua, BAO Fei-hu, et al. Design and implementation of missile test process optimizing system [J].Missiles and Space Vehicles,2012(2):43-46.(in Chinese) [12] Lu H, Wang X, Liu J. Constraint handling technique in test task scheduling problem[J]. Information Technology Journal, 2014, 13(8):1495-1504. [13] Addition I. Chaotic Multiobjective evolutionary algorithm based on decomposition for test task scheduling problem[J]. Mathematical Problems in Engineering, 2014(4):11-18. [14] Lu H, Zhu Z, Wang X, et al. A variable neighborhood MOEA/D for multiobjective test task scheduling problem[J]. Mathematical Problems in Engineering, 2014(3):1-14. [15] Lu H, Niu R, Liu J, et al. A chaotic non-dominated sorting genetic algorithm for the multi-objective automatic test task scheduling problem[J]. Applied Soft Computing, 2013, 13(5):2790-2802. [16] Lu H, ZHANG M M. Non-integrated algorithm based on EDA and Tabu search for test task scheduling problem[C]∥Proceedings of 2015 IEEE AUTOTESTCON. National Harbor, MD, US:IEEE,2015: 261-268.
第39卷 第2期2018 年2月兵工学报ACTA ARMAMENTARIIVol.39No.2Feb.2018
|