[1] Jewel A. Sortie generation capacity of embarked airwings,ADA359178[R]. Alexandria:Center for Naval Analysis,1997. [2] 冯强,曾声奎,康锐. 基于MAS的舰载机动态调度模型[J]. 航空学报, 2009,30(11): 2119-2125. FENG Qiang, ZENG Sheng-kui, KANG Rui. A MAS-based model for dynamic scheduling of carrier aircraft[J]. Chinese Journal of Aeronautics, 2009, 30(11):2119-2125.(in Chinese) [3] 马登武,郭小威,邓力.基于改进蚁群算法的舰载机弹药调度[J]. 系统仿真学报, 2012,24(6): 1207-1211. MA Deng-wu, GUO Xiao-wei, DENG Li. Ammunition scheduling of carrier-based aircraft based on modified ant colony algorithm[J]. Journal of System Simulation, 2012, 24(6): 1207-1211.(in Chinese) [4] 魏昌全, 陈春良, 王保乳. 基于出动方式的舰载机航空保障调度模型[J]. 海军航空工程学院学报, 2012, 27(1): 111-114. WEI Chang-quan,CHEN Chun-liang,WANG Bao-ru. Research on the aircraft support scheduling model of carrier-based aircraft based on launch mode[J].Journal of Naval Aeronautical and Astronautical University,2012,27(1): 111-114.(in Chinese) [5] 侯玉,汪斌,王平,等. 基于Petri网工作流网在舰载机出航准备建模中的应用[J].兵工自动化, 2007,26(8): 25-26. HOU Yu, WANG Bin, WANG Ping, et al. Application of workflow network based on Petri net in launching out modeling of aircrafts on carrier[J]. Ordnance Industry Automation, 2007,26(8): 25-26.(in Chinese) [6] 冯强,曾声奎,康锐. 基于多主体的舰载机综合保障过程建模方法[J].系统工程与电子技术,2010,32(1): 211-216. FENG Qiang,ZENG Sheng-kui,KANG Rui. Multi agent-based modeling method for integrated logistic support of the carrier aircraft[J]. Systems Engineering and Electronics, 2010,32(1): 211-216.(in Chinese) [7] 林骥鹏.基于离散事件的舰载机出动架次计算方法研究[D].哈尔滨:哈尔滨工程大学,2012. LIN Ji-peng. Research on aircraft sortie generation rate based on discrete event[D]. Harbin:Harbin Engineering University,2012.(in Chinese) [8] 张柳,于永利.基于GRASP的系统维修时间和维修工时模型[J]. 中国机械工程, 2002,13(7): 43-45. ZHANG Liu, YU Yong-li. GRASP-based maintenance time and man-hour model[J]. China Mechanical Engineering, 2002,13(7): 43-45.(in Chinese) [9] 徐航,朱一凡,陈春良.战伤装甲装备维修工时仿真及其分布规律研究[J].系统仿真学报,2006,18(10):2945-2951. XU Hang, ZHU Yi-fan, CHEN Chun-liang. Research on battlefield damaged armored materiel maintenance man hour simulation and its distribution[J]. Journal of System Simulation, 2006,18(10): 2945-2951.(in Chinese) [10] 王学望,康锐,张侦英,等.任务驱动的保障活动时间优化[J]. 计算机集成制造系统, 2010,16(10): 2227-2232. WANG Xue-wang, KANG Rui, ZHANG Zhen-ying,et al. Task-driven support activity time optimization[J].Computer Integrated Manufacturing Systems, 2010,16(10): 2227-2232.(in Chinese) [11] 冯允成,吕春莲.随机网络及其应用[M].北京:北京航空航天大学出版社,1987:9-11. FENG Yun-cheng,LYU Chun-lian. The random network and application[M]. Beijing:Beijing University of Aeronautics and Astronautics Press,1987:9-11.(in Chinese) [12] Pritsker A A.GERT graphical evaluation and review technique[M].Santa Monica:Rand Corporation,1966. [13] Whitehouse G E. Systems analysis and design using network techniques[M]. Englewood Cliffs:Prentice-Hall,1973:243-250. [14] Nicolai W. On the temporal analysis of special GERT networks using a modified Markov renewal process[J]. Zeitschrift für Operations Research, 1980, 24(7): 263-272. [15] Singh H R, Shankar G. GERT analysis of two-stage attribute sampling plans based on an exponential failure model[J]. Microelectronics Reliability, 1988, 28(2): 319-321. [16] Zimmermann J. Time complexity of single-and identical parallel-machine scheduling with GERT network precedence constraints[J]. Mathematical Methods of Operations Research, 1999, 49(2): 221-238. [17] 吴艳霞, 胡海青, 申团营. 企业技术创新项目群风险与周期评估的组合 GERT 网络模型研究[J]. 管理工程学报, 2007, 21(2): 55-58. WU Yan-xia,HU Hai-qing,SHEN Tuan-ying. Make up GERT net model research of project group risk and period reviewing on bringing forth new ideas of enterprise technology [J]. Journal of Industrial Engineering and Engineering Management, 2007, 21(2): 55-58.(in Chinese) [18] Jewell A, Wigge M A, Gagnon C M, et al. USS nimitz and carrier airwing nine surge demonstration,ADA362472 [R]. Alexandria:Center for Naval Analyses,1998. |