[1] Hayashi Y, Tamura K, Mori M, et al. Simulation analyses of buildings damaged in the 1995 Kobe, Japan, earthquake considering soil-structure interaction[J]. Earthquake Engineering and Structural Dynamics, 1997, 28 (4): 371-391. [2] Nakamura Susumu, Ezaki Jyunich, Suetomi Iwao, et al. Investigation, analysis and restoration of the collapsed Daikai subway station during the 1995 Hyogoken Nambu earthquake[C]∥ 3rd Kansai International Geotechnical Forum. Japan: Japan Society of Civil Engineering, 1997. [3] 周健南,金丰年,范华林,等.震后地下拱结构的抗冲击波动载能力评估[J].工程力学,2012,29(2):159-164,171. ZHOU Jian-nan, JIN Feng-nian, FAN Hua-lin, et al. Residual dynamic resistance of seismic damaged underground arch[J]. Engineering Mechanics, 2012, 29(2): 159-164, 171.(in Chinese) [4] 周健南,范华林,金丰年,等.非均布荷载作用下震后地下拱结构抗动载能力评估[J].工程力学,2012,29(增刊1):119-123,140. ZHOU Jian-nan, FAN Hua-lin, JIN Feng-nian, et al. Residual dynamic resistance assessment of seismic damaged underground arch under non-uniform explosion loading[J]. Engineering Mechanics, 2012, 29(S1): 119-123, 140.(in Chinese) [5] 范鹏贤,王明洋,冯淑芳,等.直墙拱顶地下结构受爆炸地震波作用的动力响应[J].振动与冲击,2014,33(22):183-187. FAN Peng-xian, WANG Ming-yang, FENG Shu-fang, et al. Dynamic response of underground straight-wall-round-arch structure subjected to explosion seismic wave[J].Journal of Vibration and Shock, 2014,33(22): 183-187.(in Chinese) [6] 王光勇,顾金才,陈安敏,等.锚固洞室在顶爆作用下破坏形式及破坏过程研究[J].岩土工程学报,2015,37(8):1381-1389. WANG Guang-yong, GU Jin-cai, CHEN An-min, et al. Failure modes and process of tunnels reinforced by rockbolts under top explosion[J].Chinese Journal of Geotechnical Engineering, 2015, 37(8): 1381-1389.(in Chinese) [7] 谢威,蒋美蓉,周健南,等.空爆作用下复合材料加固圆拱动力响应数值模拟[J].武汉理工大学学报,2014,36(1):135-139. XIE Wei, JIANG Mei-rong, ZHOU Jian-nan, et al. Numerical simulation on dynamic response of circular concrete arch strengthened with composite materials under air blast loading[J].Journal of Wuhan University of Technology, 2014, 36(1): 135-139.(in Chinese) [8] 康婷,许金余,白应生,等.爆炸冲击荷载作用下拱结构的弹塑性动力响应研究[J]. 兵工学报,2013,34(9):1097-1102. KANG Ting, XU Jin-yu, BAI Ying-sheng, et al. Elastic-plastic ana-lysis on dynamic response of arch subjected to explosive impact[J]. Acta Armamentarii, 2013, 34(9): 1097-1102. (in Chinese) [9] Tu Z G, Lu Y. Evaluation of typical concrete material model used in hydrocodes for high dynamic response simulations[J].International Journal of Impact Engineering, 2009, 36(1): 132-146. [10] 贾彬,李正良,陶俊林,等.混凝土SHPB试验数值模拟研究[J].固体力学学报,2010,31(增刊1):216-221. JIA Bin, LI Zheng-liang, TAO Jun-lin, et al. Research on numerical simulation of SHPB concrete tests[J].Chinese Journal of Solid Mechanics, 2010, 31(S1): 216-221.(in Chinese)
[11] 田力,朱聪,王浩,等.碰撞冲击荷载作用下钢筋混凝土柱的动态响应及破坏模式[J].工程力学,2013,30(2):150-155. TIAN Li, ZHU Cong, WANG Hao, et al. Dynamic response and failure modes of RC columns under impact[J].Engineering Mechanics, 2013, 30(2): 150-155.(in Chinese)
第38卷 第9期2017 年9月兵工学报ACTA ARMAMENTARIIVol.38No.9Sep.2017
|