[1] 装备测试性工作通用要求: GJB 2547A—2012[S]. 北京: 中国人民解放军总装备部, 2012. General requirement for materiel testability program: GJB 2547A—2012[S]. Beijing: General Armament Department of PLA, 2012. (in Chinese) [2] RAMOS G, SANCHEZ J L, TORRES A, et al. Power system security evaluation using Petri nets[J]. IEEE Transactions on Power Delivery, 2010, 25(1):316-322 [3] 方欢, 方贤文, 王丽丽. Petri网在可靠性分析中的研究综述[J]. 计算机科学, 2014, 41(7):40-44. FANG H, FANG X W, WANG L L. Review of reliability analysis based on Petri nets[J]. Computer Science, 2014, 41(7):40-44. (in Chinese) [4] 石健, 王少萍, 王康. 基于GSPN的机载液压作动系统可靠性模型[J]. 航空学报, 2011, 32(5):920-933. SHI J, WANG S P, WANG K. GSPN-based reliability model of aircraft hydrautic actuator system[J]. Acta Aeronautica et Astronautica Sinica, 2011, 32(5):920-933. (in Chinese) [5] 李展, 单士华. 基于GSPN的舰载服务器系统可靠性建模及分析[J]. 火力与指挥控制, 2015, 40(5):57-60, 64. LI Z, SHAN S H. Modeling and analysis of reliability for shipboard sever system by GSPN[J]. Fire Control & Command Control, 2015, 40(5):57-60, 64. (in Chinese) [6] 王小强, 韩斌. 基于GSPN的飞机测试性指标确定方法研究[J]. 计算机测量与控制, 2016, 24(4):13-15, 18. WANG X Q, HAN B. Research on determination method for testability index of aircraft based on GSPN[J]. Computer Measurement & Control, 2016, 24(4):13-15, 18. (in Chinese) [7] 孙智, 孙建红, 李冰月, 等. 基于分层多信号流图的飞机空调系统故障诊断[J]. 振动.测试与诊断, 2018, 38(1):196-201, 215. SUN Z, SUN J H, LI B Y, et al. Fault diagnosis of aircraft air conditioning system based on hierarchy multi-signal flow[J]. Journal of Vibration, Measurement & Diagnosis, 2018, 38(1):196-201, 215. (in Chinese) [8] 李妍琛. 利用随机Petri网分析软件可靠性[J].计算机应用与软件, 2009, 26(8):133-135. LI Y C. Reliability analysis of software system using generalized stochastic Petri net[J]. Computer Measurement & Control, 2009, 26(8):133-135.(in Chinese) [9] 沈如松, 张育林. 基于UML和Petri网的武器装备体系需求分析方法[J].系统工程理论与实践, 2006, 5(1): 136-140. SHEN R S, ZHANG Y L. Method of analyzing requirements of weapon equipment architecture based on UML and Petri net [J].Systems Engineering - Theory & Practice, 2006, 5(1): 136-140. (in Chinese)
[10] 苏春. 基于GSPN模型的系统动态可靠性仿真研究[J]. 中国机械工程, 2008,19(1):1-5. SU C. Simulation of system dynamic reliability based ongeneral stochastic Petri net [J]. China Mechanical Engineering, 2008,19(1):1-5. (in Chinese) [11] 故障模式影响及危害性分析指南:GJB/Z 1391—2006[S]. 北京: 中国人民解放军总装备部, 2006. Guide to failure mode, effects and criticality analysis: GJB/Z 1391—2006[S]. Beijing: General Armament Department of PLA, 2006. (in Chinese) [12] 孙有朝, 郭媛媛, 崔灿丽. 应用有色Petri网的复杂系统四性一体化综合评估方法研究[J]. 南京航空航天大学学报, 2017, 49(5): 707-717. SUN Y C, GUO Y Y, CUI C L. Research on complex system four qualities integration evaluation based on color Petri net[J]. Journal of Nanjing University of Aeronautics & Astronautics, 2017, 49(5):707-717. (in Chinese) [13] 王瑶. 基于Petri网的四性一体化建模及仿真方法研究[D]. 西安:西北工业大学,2016. WANG Y. A modelling and simulation method for reliability, testability, maintainability and safety analysis based on Petrinets[D]. Xi'an:Northwestern Polytechnical University, 2016. (in Chinese) [14] ZHAO J T, CHEN Z Q, LIU Z X. Modeling and analysis of colored Petri net based on the semi-tensor product of matrices[J]. Science China (Information Sciences), 2018, 61(1):70-85. [15] WU X Y, YAN H, LI L R. Numerical method for reliability analysis of phased mission system using Markov chains[J]. Communication in Statistics: Theory and Methods, 2012, 41(21):3960-3973. [16] 邱静, 刘冠军, 杨鹏,等. 装备测试性建模与设计技术[M]. 北京: 科学出版社, 2012. QIU J, LIU G J, YANG P,et al. Equipment test modeling and design technology[M]. Beijing: Science Press, 2012. (in Chinese) [17] 苏永定.装备系统测试性需求分析技术研究[D]. 长沙: 国防科学技术大学, 2011. SU Y D. Research on testability requirement analysis for equipment[D]. Changsha: National University of Defense Technology, 2011. (in Chinese) [18] 林闯. 随机Petri网和系统性能评价[M]. 北京:清华大学出版社, 2005:19-35. LIN C. Evaluation of stochastic Petri net and system performance [M]. Beijing: Tsinghua University Press, 2005:19-35. (in Chinese) [19] 闫华, 武小悦.基于任务弧段的测控通信任务可靠性建模方法[J].航空动力学报,2012, 27(12):2769-2777. YAN H, WU X Y. Reliability model of TT&C and communication task on task arc[J]. Journal of Aerospace Power, 2012, 27(12): 2769-2777. (in Chinese)
第40卷 第10期2019 年10月兵工学报ACTA ARMAMENTARIIVol.40No.10Oct.2019
|