[1] 田仲,石君友.系统测试性设计分析与验证[M].北京:北京航空航天大学出版社,2003:361-396. TIAN Zhong, SHI Jun-you. Design, analysis and demonstration of system testability[M]. Beijing: Beihang University Press, 2003: 361-396.(in Chinese) [2] 沈岭,周鸣歧.航天产品测试性试验验证方法[J].中国质量, 2006(7):16-18. SHEN Ling, ZHOU Ming-qi. Testability demonstration methods of aerospace products[J].China Quality, 2006(7):16-18. (in Chinese) [3] 何洋,叶晓慧,赵建扬.机电设备的测试性试验初探[J].电光与控制,2011,18(11):92-95. HE Yang, YE Xiao-hui, ZHAO Jian-yang.On testability verification for electromechanical equipment[J]. Electronics Optics & Control, 2011, 18(11):92-95.(in Chinese) [4] 张小波,常瑞承.舰艇型号工程测试性验证与评价方法[J].舰船科学技术,2014,36(7):150-153. ZHANG Xiao-bo, CHANG Rui-cheng. The study of the ship engineering development testablilty evaluation method[J]. Ship Science and Technology, 2014, 36(7): 150-153. (in Chinese) [5] 常春贺,杨江平,王杰.雷达装备测试性验证及应用研究[J].计算机测量与控制,2011,19(8):1943-1949. CHANG Chun-he, YANG Jiang-ping, WANG Jie. Research on verification and application of testability of radar equipment[J]. Computer Measurement & Control, 2011, 19(8): 1943-1949. (in Chinese) [6] 张联禾.基于模拟试验的测试性评估方法研究[J].西南师范大学学报:自然科学版,2014, 39(11):122-127. ZHANG Lian-he. Testability evaluation method based on the simulation test study of flight test phase[J]. Journal of Southwest China Normal University:Natural Science Edition, 2014, 39(11): 122-127. (in Chinese) [7] 中国人民解放军总装备部.GJB 2547A—2012 装备测试性工作通用要求[S].北京:中国人民解放军总装备部, 2012. General Armaments Department of the Chinese People's Liberation Army. GJB 2547A—2012 General requirement for materiel testability program[S]. Beijing: General Armaments Department of the Chinese People's Liberation Army, 2012. (in Chinese) [8] 张艺琼,武月琴,曾照祥,等.测试性验证试验中的综合评估方法[J].测控技术,2013,32(6):133-139. ZHANG Yi-qiong, WU Yue-qin, ZENG Zhao-xiang,et al. Method of integrated evaluation of testability validation test[J]. Measurement & Control Technology, 2013, 32(6): 133-139. (in Chinese) [9] 王京,李天梅,何华锋,等.多源测试性综合评估数据等效折合模型与方法研究[J].兵工学报,2017,38(1):151-159. WANG Jing, LI Tian-mei, HE Hua-feng,et al. Research on multi-source data equivalent methods for testability integrated evaluation[J]. Acta Armamentarii,2017, 38(1): 151-159. (in Chinese) [10] 韩志钢.装备测试性综验证技术研究[J].可靠性与环境适应性理论研究,2016,34(2):7-9. HAN Zhi-gang. A comprehensive testability verification technology of equipment[J]. Electronic Product Reliability and Environmental Testing, 2016, 34(2): 7-9. (in Chinese) [11] 余龙海,史贤俊,肖支才.基于使用阶段数据的装备测试性验证方法[J].电光与控制,2016,23(6):90-95. YU Long-hai, SHI Jun-xian, XIAO Zhi-cai. A method for testability verification of armament based on data of service stage[J]. Electronics Optics & Control, 2016,23(6): 90-95. (in Chinese) [12] 田仲.测试性验证方法研究[J].航空学报,1995,16(增刊):65-70. TIAN Zhong. Study on testability demonstration methods[J]. Acta Aeronautica et Astronautica Sinica, 1995, 16(S):65-70. (in Chinese) [13] 徐忠伟,周玉芬,徐松涛,等.测试性验证中抽样方案的精确算法及应用[J].航空学报,2000,21(1):67-69. XU Zhong-wei, ZHOU Yu-fen, XU Song-tao,et al. Accurate algorithm of sampling plan & its application in testability demonstration[J]. Acta Aeronautica et Astronaunica, 2000, 21(1):67-69. (in Chinese) [14] 田仲.测试性分配和预计[J].北京航空航天大学学报,1995,21(4):13-17. TIAN Zhong. Testability allocation and prediction[J]. Journal of Beijing University of Aeronautics and Astronautics, 1995, 21(4): 13-17. (in Chinese) [15] 魏世孝,周献中.多属性决策理论方法及其在C3I系统中的应用[M].北京:国防工业出版社,1998:76-77. WEI Shi-xiao, ZHOU Xian-zhong. Multi-attribute decision-making theory and its application in C3I system[M]. Beijing: National Defense Industry Press, 1998:76-77. (in Chinese) [16] 张永锋,骆清国.装甲车辆柴油机整机性能的综合评价[J].机械工程学报,2006,42(13):205-208. ZHANG Yong-feng, LUO Qing-guo. Comprehensive evaluation of diesel engine performance for armored vehicles[J]. Chinese Journal of Mechanical Engineering, 2006, 42(13):205-208. (in Chinese) [17] 东北师范大学. GB/T 4087—2009 数据的统计处理和解释:二项分布可靠度单侧置信下限[S]. 北京:中国标准出版社,2009. Northeast Normal University. GB/T 4087—2009 Statistical interpretation of data—one-side confidence lower limit of reliability for binomial distribution[S].Beijing: Standards Press of China, 2009. (in Chinese)
第39卷第6期 2018 年6月兵工学报ACTA ARMAMENTARIIVol.39No.6Jun.2018
|